Back to Products
Touch Kiosk Mini Game

Factory Sort

Identify the Product. Split the Right Banda.

The player separates the products that progress in the production band by dragging them to the correct outputs according to the type, color or packaging feature, about 30–60 Second-second attention and classification game.

  • Production Tape
  • Drag-drop
  • Classification
  • Accuracy score
How Does It Work?
At a Glance

Experience Information

These figures are preliminary planning ranges. Final capacity, space and installation plans are confirmed after a site survey.

Capacity
1 player / station
Duration
20–60 seconds
Throughput
60–120 people / hour
Environment
Indoor or sheltered event space
Area
Approximately 2 × 2 m
Setup
1–3 hours
How Does It Work?

What's Included in the Experience?

Together, we configure the core features around your project goals, participant flow and available space.

Live Band Streaming

Products enter the screen with a gradual increasing speed, establishing a continuous and understandable game rhythm.

Rule-Based Separation

The player drags the products into the designated category, color, or feature box.

Efficiency Score

The right separated product, number of errors and mass production speed are summarized at the end of the round.

Use Cases

Events and touchpoints where this experience works best.

  • Production and technology fairs
  • Employee training events
  • Logistics brand areas

How Can It Be Tailored to Your Brand?

Customization options, from visual style to game flow.

  • Product and packaging visuals
  • Classification rule and band speed
  • Education message, report or QR Flow

Technical Requirements

The final technical plan is confirmed using the site survey and event details.

  • 220 V power, a level and accessible kiosk installation, and a suitable multi-touch screen.
  • A stable internet connection and the relevant peripherals are required for QR, leaderboard, coupon or prize integrations.
  • If a chance-based result or reward is to be used, the conditions of participation, stock, eligibility, and data flow are approved before publication.
  • It requires at least a Full HD touchscreen and a stable kiosk computer.
  • Product classes and correct matches to be used are verified by the customer before content production.

Included in the Service

Core components of planning, production and delivery.

  • Production Band Game Software
  • Product content templates
  • Kiosk setup and game settings
Ways to Work With Us

Service Options

The right service option depends on duration, location, customization and operational scope.

Common Questions

Frequently Asked Questions

Quick answers about use cases, customization and technical requirements.

What is Factory Sort?

The player separates the products that progress in the production band by dragging them to the correct outputs according to the type, color or packaging feature, about 30–60 Second-second attention and classification game.

Where can Factory Sort be used?

Production and technology fairs; Employee training events; Logistics brand areas.

Can Factory Sort be customized for our brand?

Product and packaging visuals; Classification rule and band speed; Education message, report or QR Flow.

What are the technical requirements for Factory Sort?

220 V power, a level and accessible kiosk installation, and a suitable multi-touch screen; A stable internet connection and the relevant peripherals are required for QR, leaderboard, coupon or prize integrations; If a chance-based result or reward is to be used, the conditions of participation, stock, eligibility, and data flow are approved before publication; It requires at least a Full HD touchscreen and a stable kiosk computer; Product classes and correct matches to be used are verified by the customer before content production.

Keep Exploring

Related Products

All Products
Make the Next Game Yours

Let's Tailor This Experience to Your Brand.

Add the product to your quote list. We'll use your event details to define the scope, installation and service option together.

Create a Project Brief